Contact Us

EVCC Test Kit Charging Pile Controller Series

Compliant with ISO15118 (TLS, PnC, AC), DIN70121, SAE, and CHADEMO communication protocol standards, it supports bidirectional communication (V2G, V2V protocols) between electric vehicles and the grid through UDS diagnostic services. It provides reliable and stable standard charging communication conversion solutions and more flexible private protocol solutions for automakers.


DATASHEET

Datasheet of EVCC Test Kit Charging Pile Controller Series

EVCC Test Kit

Specifications

Standards

DIN70121, ISO 15118-2, ISO 15118-20

Software

Windows / Linux GUI

Compatibility

SAE J2954

Report Format

PDF, CSV, XML

Interface

PLC, CAN, Ethernet

Update

OTA software update

Full DIN70121 & ISO 15118-2/20 test coverage

Automated conformance test scripts

Real-time protocol analysis

Plug & Charge (PnC) test scenarios

V2G test mode support

Detailed test report generation





AUPINS: One-Stop Electric Vehicle Charging Solutions Manufacturer
1111, 11th Floor, Shanchuang Cultural Business Building, Yuhuatai District, Nanjing City, Jiangsu Province, China
AUPINS: One-Stop Electric Vehicle Charging Solutions Manufacturer
News
AUPINS Inspirations & Updates
ISO 15118 vs OCPP: Two Conversations, One Charger
Nov 09, 2026
ISO 15118 vs OCPP: Two Conversations, One Charger
Every DC fast charger on a commercial site is holding two conversations at the same time. They run in parallel, they use different protocols, and they answer to different masters. Confusing them is th...
16A vs 32A Type 2 Charging Cables: A Single-Phase and Three-Phase Stocking Guide
Nov 04, 2026
16A vs 32A Type 2 Charging Cables: A Single-Phase and Three-Phase Stocking Guide
For EV charger distributors, installers and charging equipment resellers, stocking the right cable specifications helps meet different customer requirements without tying up inventory in unsuitable pr...
7, 11 or 22 kW AC Wallbox Chargers: How to Specify a Commercial Parking Project
Nov 01, 2026
7, 11 or 22 kW AC Wallbox Chargers: How to Specify a Commercial Parking Project
Commercial EV charging projects require more than selecting the highest available power rating. Parking duration, vehicle compatibility, electrical capacity and installation costs all influence the ri...
+86-18512525557
felixxu@aupins.com
1111, 11th Floor, Shanchuang Cultural Business Building, Yuhuatai District, Nanjing City, Jiangsu Province, China
Contact Us
felixxu@aupins.com
1111, 11th Floor, Shanchuang Cultural Business Building, Yuhuatai District, Nanjing City, Jiangsu Province, China
We use cookies on this site, including third party cookies, to delivery experiennce for you.
Accept Cookies
Read Privacy Policy
×